Study and design of 04 bulk product discharge hoppers of 50m3

Project duration: 08 months

Location: Autonomous Port of Dakar

TREMIE TVS_TI.jpg

TVS

Team and equipment mobilized 

  • 01 Project lead engineer

  • 01 Steel Structure Manager

  • 08 Boilermakers

  • 08 Welders

  • 04 Painters

  • 04 Sanders

  • 01 5T crane truck

  • 01 Flatbed truck

Project stage

  • Computer-aided study and design

    • Definition of specifications

    • General drawing

    • Development of detailed plans

  • Prefabrication

  • Sandblasting and painting

  • Delivery on site

  • On-site assembly and testing