Excellec SA
Prefabrication and assembly of a 246m long frame with 3 overhead cranes
Project duration: 06 months
Location: Diamniadio industrial zone

Team and equipment mobilized:
-
01 Project lead engineer
-
01 Steel structure manager
-
01 Electrical Manager
-
01 Roofing and Waterproofing Manager
-
01 Scheduling and Quality Officer
-
01 QHSE Manager
-
08 Boilermakers
-
06 Welders
-
06 Editors
-
04 Mechanics
-
02 electricians
-
01 5T crane truck
-
01 25T mobile crane
-
01 Flatbed truck

Project stage
-
Computer Assisted design
-
Profile dimensioning
-
General drawing
-
Development of detailed plans
-
-
Prefabrication
-
Team planning
-
Material transport
-
Cutting of plates
-
Post fabrications and drillings
-
Crossbowmen's Confections
-
Anti-rust painting and finishing
-
White assembly and registration
-
-
Bare frame assembly
-
On-site transport
-
Night work to avoid production blockages
-
Bolted assembly of the entire structure
-
Installing and adjusting raceways
-
-
Installation of overhead cranes
-
Assembly of the beam and the bedsteads
-
Installation of the assembly on the raceways
-
Electrical connection
-
Installation of the protected supply duct and connection
-
Supply, testing and commissioning
-
-
Finishing
-
Installation of the roof and cladding
-
Touch up paint
-
Material withdrawal
-