Excellec SA

Prefabrication and assembly of a 246m long frame with 3 overhead cranes

Project duration: 06 months

Location: Diamniadio industrial zone

LIVRAISON EXCELLEC_TI.JPG

Team and equipment mobilized:

  • 01 Project lead engineer

  • 01 Steel structure manager

  • 01 Electrical Manager

  • 01 Roofing and Waterproofing Manager

  • 01 Scheduling and Quality Officer

  • 01 QHSE Manager

  • 08 Boilermakers

  • 06 Welders

  • 06 Editors

  • 04 Mechanics

  • 02 electricians

  • 01 5T crane truck

  • 01 25T mobile crane

  • 01 Flatbed truck

MONTAGE EXCELLEC_TI.JPG

Project stage

  • Computer Assisted design

    • Profile dimensioning

    • General drawing

    • Development of detailed plans

 

  • Prefabrication

    • Team planning

    • Material transport

    • Cutting of plates

    • Post fabrications and drillings

    • Crossbowmen's Confections

    • Anti-rust painting and finishing

    • White assembly and registration

  • Bare frame assembly

    • On-site transport

    • Night work to avoid production blockages

    • Bolted assembly of the entire structure

    • Installing and adjusting raceways

  • Installation of overhead cranes

    • Assembly of the beam and the bedsteads

    • Installation of the assembly on the raceways

    • Electrical connection

    • Installation of the protected supply duct and connection

    • Supply, testing and commissioning

  • Finishing

    • Installation of the roof and cladding

    • Touch up paint

    • Material withdrawal

MONTAGE EXCELLEC_TI.JPG
MONTAGE EXCELLEC_TI.jpeg
MONTAGE EXCELLEC_TI.JPG