top of page

TVS
Study and design of 04 bulk product discharge hoppers of 50m3
Project duration: 08 months
Location: Autonomous Port of Dakar

Team and equipment mobilized:
-
01 Project lead engineer
-
01 Steel structure manager
-
01 Electromechanical Manager
-
03 Boilermakers
-
02 Welders
-
02 Mechanics
-
01 5T crane truck
-
01 Flatbed truck
Team and equipment mobilized:
-
Computer-aided study and design
-
Definition of specifications
-
General drawing
-
Development of detailed plans
-
-
Prefabrication
-
Assembly
-
Assembly of motors
-
Assembly of the bearings
-
Assembly of the sieve mesh
-
-
Installation and testing on site
-
Transport and installation on site
-
Connection and test
-