Study and design of 04 bulk product discharge hoppers of 50m3

Project duration: 08 months

Location: Autonomous Port of Dakar

IMG_E3799.JPG

Team and equipment mobilized:

  • 01 Project lead engineer

  • 01 Steel structure manager

  • 01 Electromechanical Manager

  • 03 Boilermakers

  • 02 Welders

  • 02 Mechanics

  • 01 5T crane truck

  • 01 Flatbed truck

Team and equipment mobilized:

  • Computer-aided study and design

    • Definition of specifications

    • General drawing

    • Development of detailed plans

  • Prefabrication

  • Assembly

    • Assembly of motors

    • Assembly of the bearings

    • Assembly of the sieve mesh

  • Installation and testing on site

    • Transport and installation on site

    • Connection and test